Roller Dryer installation Test

1, the equipment should be installed on the level of concrete foundation, with anchor bolts fixed.

2, the installation should pay attention to the host body and horizontal vertical.

3, after installation check all parts of the bolts are loose and the main storage door is tight, such as please tighten.

4, according to the power of equipment to configure the power cord and control switch.

5, the inspection is complete, carries on the empty load test, the test run normal can carry on the production.