Home > News > Content
Product Categories

Cleaning Machine Preparation Prelude

A, check the pipeline system there is no leakage of leakage, if such a situation, should notify the maintenance personnel repair.

b, check whether the cleaning fluid is adequate, if not enough, in time to increase the cleaning fluid.

C, the first point of the test, and then empty operation 2-3 minutes, check the transmission system (motor, coupling, reducer) and the movement of the belt is smooth, to confirm that all normal, before the production.

D, open the oil spill elimination device (excluding oil slick exclusion device) began to exclude oil, so when the water pump is still open, the water surface calm, the best discharge effect, to wait for the oily sludge after the basic exclusion to stop degreasing, oily dock use lunch time.


Services & Products
washing machine
wash equipment
Washer Extractor
Tumble dryer
flatwork ironer
bed sheet folding machine
Contact Us
Tel: +86-523-89607776
Fax: +86-523-86668085
Phone: +86-13961087063
Add: No.6 Suchen Industrial Zone, Taizhou City, Jiangsu Province,225300 China
Email: shine@hangxinggroup.com
Feedback